
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
39
FIG. 39-2
36. Bolt the runner cover to RH runner
(FIG. 39-2). Next, reattach chain arm to
RH runner. Then, bolt on the pin collar to
secure chain arm (FIG. 39-2). Repeat
for LH runner.
NOTE: The runner cover, with the “ALIGN
ARROWS” decal, is installed on the
LH runner.
35. Use control box to lower (DOWN)
platform on jack stands (FIG. 39-1) so
inboard edge is 4” below ramp edge.
FIG. 39-1
CHAIN
ARM
RUNNER
COVER
RUNNER
34. Use control box to raise the platform
(UP) slightly and remove 2 jack stands
near the inboard edge (FIG. 39-1).
BOLT
PIN
COLLAR
LOCK NUT
37. If necessary, do the BLEEDING
HYDRAULIC FLUID procedure in
this manual.
NOTE: If a new cover is being bolted on
the LH runner, the serial plate
must transferred from old cover
to new cover. Also, a new “ALIGN
ARROWS” decal must be installed
on the new cover.
RAMP
JACK STAND
(AND JACKSTAND
NOT SHOWN)
PLATFORM
4”
INBOARD
EDGE
RAMP
EDGE
Comentários a estes Manuais